-
How long does it take to build and install Module 5?
Posted by Styrofoam on 16/06/2025 at 13:48.
Styrofoam replied 1 week, 2 days ago 1 Member · 1 Reply -
1 Reply
-
Module 5 stands out exceptional speed of construction and assembly, which is one of its key advantages. Thanks to modular system and prefabricated elements, phase rough construction and assembly can be completed in an incredibly short time – within just a few daysThis means that the basic structure of the building, including walls, roof and floors, is ready for further work practically immediately.
After the rough construction is completed, the following final worksTheir duration depends on interior complexity and selected materials and equipment. However, thanks to the efficiency of modular construction, these works are usually completed within a few weeksThis includes installation of installations (water, electricity, heating), interior partitions, floor coverings, painting, installation of joinery and all furniture and equipment.
In short, from the moment of installation until immigration in Module 5, will only pass a few weeks, making it the ideal solution for anyone who needs fast and efficient construction, without compromising on quality.
Log in to reply.